-
Options for the Babine River Area
Land management strategies and access route options for the Babine River planning area. -
Old Woman Lake - Secondary Lake Inventory
The purpose of this survey is to conduct secondary lake inventories in the southern portions of the Morice and Lakes Forest Districts (Prince Rupert Forest Region). The lake was... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies... -
North Coast Land and Resource Management Plan
The North Coast Land and Resource Management Plan (LRMP) covers approximately 1.7 million hectares of land. The LRMP represents the consensus reached by the participants of the... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal... -
Maxan Creek Stream Survey 1974
This stream survey evaluates Maxan Creek. Elements included are the location, physical characteristics, and water quality of the creek, the species present, and the surrounding... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG Project
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and... -
Lakes of the Skeena River Drainage VI: The Lakes of the Upper Sustut River
This report summarizes the study of the lakes of the Upper Sustut River in 1946. Sustut Lake, Asitka Lake, Johanson Lake, Darb Lake, and Spawning lake were surveyed for fish... -
Kitsumkalum Traditional Use Study Interim Report for Pacific Northwest LNG/Petronas
This interim report summarizes the written literature on the Kitsumkalum First Nation in regards to their traditional land use practices within their traditional territory.... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental... -
Gitanyow Huwilp Recognition and Reconciliation Agreement Part 2: Gitanyow...
Part 2: Gitanyow Lax'yip land use plan contains: Schedule A Gitanyow Wilp Territory maps showing land use zones and management areas; and Schedule B management objectives for... -
Forest and Range Evaluation Program (FREP) Dashboard
This Dashboard conveys the results of monitoring that has been carried out by the Forest and Range Evaluation Program (FREP). FREP aims to assess the impacts of forest and range...