-
Habitat Improvement and Outplanting Possibilities - Upper Bulkley/ Morice Systems
The NCD Habitat Unit, along with coho biologists from the Science Branch, conducted a juvenile coho sampling program on the Upper Bulkley/Morice River systems during the month... -
An Investigation of the Condition of Kathlyn Lake, with Suggestions for...
As early as 1970, and continuing into the year 1973, concerned citizens of the Smithers area brought to the attention of the Water Resources Services the fact that nuisance weed... -
An Investigation into the Feasibility of Modifying Derelict Dams to Improve...
Skeena Fisheries Commission (SFC), in partnership with the Lax Kw’alaams Fisheries Program conducted a feasibility assessment to determine whether salmon productivity in the... -
An Inventory of Lars Lake and its Outlet and Inlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for more information on the annual recruitment and relative species... -
An Inventory of Old Man Lake and its Outlet and Inlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for more information on the annual recruitment and relative species... -
An Inventory of Swans Lake and its Outlet and Inlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for information on the annual recruitment and relative species... -
An Inventory of Gilmore Lake and its Outlet and Inlet Streams
Gilmore Lake was surveyed as part of the Burns Lake-Houston small lakes project in which a total of 10 lakes were examined. All of the lakes historically supported rainbow trout... -
An Inventory of Elwin Lake and its Inlet and Outlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for more information on the annual recruitment and relative species... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency -...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific... -
The Maxan Lake Multi-Land Use Study: A Summary Review
The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
Survey of Bulkley Lake and its Inlet and Outlet Streams
Recent reports of serious declines of the rainbow trout sport fishery in this region have created a need for information on the annual recruitment and relative species... -
Seymour Lake Rehabilitation Reconnaissance Report 1978
This purpose of this reconnaissance report is to provide further information on the proposed rehabilitation of Seymour Lake with special attention to potential problem areas and... -
Riparian and In-Stream Assessment of the Bulkley River System: An...
Sixty-eight tributaries to the Bulkley River were examined by topographic maps and air photo interpretation to assess the degree and nature of the impacts on these streams by... -
Reconnaissance Survey Seymour Lake 1977
This survey observed many beaver dams and discusses the need for rehabilitation for Seymour Lake. -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Upper Buck...
This inventory provides information regarding the characteristics, distributions, and relative abundance of fish species, as well as information on biophysical lake and stream... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using...
You can also access this registry using the API (see Dokumentasi API).