WWF - Watershed Report: Skeena Sub-Watershed 2017
WWF has completed the first Canada-wide assessment of the country’s watersheds, focusing on four indicators of river health and seven key threats. The resources below link to... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tyhee Lake Water Samples
Laboratory reports from Tyhee Lake water samples from July 1988 and June 1992 -
Tyhee Lake Creeks Phosphate Concentration
Graphs showing the concentration of phosphate in Tyhee Lake Creeks from 1993 to 1994. -
Tyhee Lake - Lake Monitoring Results
Results of the 2016 monitoring of Tyhee Lake as part of the 2016 Provincial Lake Monitoring Program. -
Trout Creek/Moricetown Watershed Assessment Project
This document contains information on the Level I Sediment Source Assessment. The Consolidated Access Management Plan (AMP) and the Interior Watershed Assessment Program (IWAP)... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report of...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and... -
The Physical Limnology of Lakelse Lake, British Columbia
During the five years, 1944 to 1948, physical and chemical studies were conducted on Lakelse lake, B.C., as part of the programme of salmon research on the Skeena river.... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
TYHEE LAKE MANAGEMENT PLAN
A document providing a water quality assessment of Tyhee Lake, prepared for the Tyhee Lake Protection Society. The eutrophication process of the lake, its physical system, water... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Suspended Sediment Telkwa River Watershed
In general, the study aimed to determine the timing of suspended sediment transport within the Telkwa watershed and isolate the sediment sources. This report presents sediment... -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and... -
South Hazelton Community Water System: 2018 Annual Water Report
This report serves to provide an overview of water source, treatment, sampling results, and current or future upgrades to the water system in South Hazelton. -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to... -
Skeena-Nass Area Bulkley River Basin Water Quality Assessment and Objectives
This historical report includes: (i) an assessment of water quality using available information (up to April, 1984) on waste discharges, water quality, streamflows, and water... -
Skeena River Estuary Assessment Project
This project assessed key pressures on salmon habitat in the Skeena River estuary. The authors used benchmarks to assess the status of salmon habitat indicators and identified...