Monitoring Land Use and Human Activities and Assessing their Potential Effect...
As a species of special concern in the Babine Watershed, grizzly bears are given specific consideration in the development of the Bulkley Land and Resource Management Plan and... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the L...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for... -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River...
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Davidson Project Description
Blue Pearl Mining is proposing to develop the Davidson deposit as an underground mine and to transport the ore off-site for processing. The Davidson deposit is situated a... -
Cumulative Effects of Planned Industrial Development and Climate Change on Ma...
Here we employ a cumulative effects model to examine and compare the relative contribution of climate change and planned industrial development to cumulative effects in a... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Coalbed Methane & Salmon: Assessing the Risks
This study aims to provide a preliminary assessment of the potential risks and pathways of impacts on salmon and salmon habitat arising from coalbed methane (CBM) development in... -
Bioassessment of Streams in North-Central British Columbia Using the Referenc...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant... -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and... -
Application Information Requirements and Valued Components Selection Document...
This application provides an overview of the details of Aurora LNG's liquefied natural gas project on Digby Island. It provides relevant history, and explains how the... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application... -
Toward a Fish Habitat Decision on the Kemano Completion Project: A Discussion...
The Kemano Completion Project is massive. The Aluminum Company of Canada (Alcan) proposes a capital expenditure in excess of $2.2 billion which could increase aluminum...