Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal... -
Mid-Bulkley Detailed Fish Habitat/Riparian/Channel Assessment for Watershed...
The Fish Habitat and Assessment Procedure (FHAP) is a means of assessing watersheds with a history of anthropogenic activity for impacts to fish and fish habitats using a set of... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries... -
Bioassessment of Streams in North-Central British Columbia Using the...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant... -
Lakelse Lake: A Collation of Research Studies and Government Documents
This reference guide has been put together for the Lakelse Watershed Stewards Society and while some aspects will seem quite familiar, other portions may be new material and... -
Stream Inventory: Owen Creek Watershed 1998
An aquatic inventory was conducted in the Owen Creek Watershed from late June through mid-August 1998. These studies were a continuation of an aquatic inventory program... -
Guidelines for Responsible Waterfront Development
Simple guidelines for responsible waterfront development in the Regional District of Bulkley Nechako. -
Excel Energy Inc: Birch Oil Sales Pipeline Pre-Impact Fisheries Habitat Assessment
Excel Energy Inc. planned to construct an oil pipeline in the area of the Birch oil field in northeastern British Columbia. The project involved the construction of...