-
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are... -
Ministry of Transportation (MOT) Culverts
A Culvert is a pipe (less than 3m in diameter) or half-round flume used to transport or drain water under or away from the road and/or right of way. Culverts that are greater...