-
Fish Passage GIS Analysis Version 2 Methodology and Output Data Specification...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Canadian Technical Report of Fisheries and Aquatic Sciences
Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical... -
Bulkley River Bank Stabilization and Riparian Rehabilitation (Telkwa, BC)
The goal of the Bulkley River Bank Stabilization and Riparian Rehabilitation Project was to re-establish a stand of native riparian zone plants immediately adjacent to the... -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic... -
Analysis of Skeena River Tributaries Downstream from the Proposed Enbridge Pi...
This study's objective was to develop and map metrics that delineate the areas of the Skeena River and its tributaries most vulnerable to potential pipeline spills associated... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area... -
Upper Bulkley River Fish Counting Fence - Plans and Photos
This dataset includes the plans and site photos of the Upper Bulkley River fish counting fence -
The Morice WFSP-Planning Linkages and Forest Licensee Support
The objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP)... -
The Changing Geography of Salmon Canning in British Columbia 1870-1931
A thesis explaining the changing geography of British Columbia's commercial salmon canning industry between 1870 and 1931. -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National... -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Roa...
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream... -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of... -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Salmon Science as Related to Proposed Development in the Skeena River Estuary
A collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days,... -
Ridley Island Port Construction Activities - 1982: Background and Environment...
This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities...