Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish Habi...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and... -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare... -
Pacific Northwest LNG: Project Description
Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Nisga'a Lands Freshwater Fish and Fish Habitat Technical Data Report for the ...
This report summarizes field data collected in 2014 for fish and fish habitat along the proposed application corridors within Nisga’a Lands. Fish and fish habitat information... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG ...
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Kitsumkalum Traditional Use Study Interim Report for Pacific Northwest LNG/Pe...
This interim report summarizes the written literature on the Kitsumkalum First Nation in regards to their traditional land use practices within their traditional territory.... -
Cumulative Effects of Planned Industrial Development and Climate Change on Ma...
Here we employ a cumulative effects model to examine and compare the relative contribution of climate change and planned industrial development to cumulative effects in a... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries... -
Aurora LNG Freshwater Fish and Fish Habitat Final Report 2014-2015
The objective of the Freshwater Fish and Fish Habitat Program was to conduct field surveys of streams within and adjacent to the Project area (i.e., location of LNG plant... -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and...