-
Toboggan Creek Coho Smolt Enumerations
The primary focus of the "Toboggan Creek Smolt Project" is to estimate the number of wild coho (0. kisutch) smolts leaving Toboggan Creek. Initiated in the spring of 1995, the... -
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was... -
Movements of Wild Summer Run Steelhead Tagged with Radio Transmitters in the ...
Radio telemetry was used for the second consecutive migration year to determine the proportion of wild, Babine River adult summer run steelhead migrating through the Department... -
Increasing Dominance of Odd-Year Returning Pink Salmon
The hypothesis that abundance patterns differ between even- and odd-year returning Pink Salmon (Oncorhynchus gorbuscha) was examined using data from the eastern and western... -
Distribution, Timing, and Numbers of Steelhead Returning to the Skeena Waters...
This report summarizes the data collected during the July to November 1995 period and describes the fate and timing information of steelhead movements to the end of November... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Sustut River Steelhead Overwinter Mortality Study (Skeena Steelhead Chevron C...
This study investigates overwinter mortality by radio tagging steelhead in the upper Sustut River and monitoring their survival between the beginning of September, 1998, and...