Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Inventory of West Julian Holland Lake
The report presents the results of a reconnaissance level “Fish and Fish Habitat Inventory” of West Julian Holland Lake 460-6006-508-005-283-218-502-01 performed to the current... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
A Reconnaissance Survey of Netalzul Meadow Lake (Alias)
Klohn-Crippen Consultants Ltd. was retained by the Fisheries Branch of the BC Ministry of Environment, Lands, and Parks in Smithers, British Columbia, to conduct a...