Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
DFO Area 4 Annual Reports 1950 - 1972
DFO Area 4 Annual Narrative Reports from 1950 to 1972. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries,... -
DFO Area 4 Annual Reports 1918 - 1949
Department of Fisheries and Oceans Area 4 Annual Reports from 1918 - 1949. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial... -
Aquatic Stream Inventory: Tanglechain IRM Unit 1996
The overall purpose of this project was to conduct fisheries inventory (to Resource Inventory Committee (RIC) standards) in operational areas identified by HFP in the Tanglechain. -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
WWF - Watershed Report: Skeena Sub-Watershed 2017
WWF has completed the first Canada-wide assessment of the country’s watersheds, focusing on four indicators of river health and seven key threats. The resources below link to... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Residual Impacts on water quality and sockeye salmon fry habitat: Twenty year...
The Morrison River enters Babine Lake from the northwest. Morrison and Tahlo Lakes are important sockeye (Oncorhynchus nerka) nursery lakes that collectively host the second... -
Prince Rupert Landfill Leachate: Impact on Hays Creek
This report documents the leachate and creek water chemistry findings and remove all doubt that the creek is adversely affected. -
Preliminary Assessment of Overwintering Habitat in the Morice Watershed
This preliminary data report examines potential indicators of overwintering habitat quality and some potential factors which may affect the the overwintering habitat quality. -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and...