-
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area... -
Stream Classification and Fish Habitat Assessment of Several Tributaries with...
The purpose of this project was to confirm Forest Practices Code (FPC) stream classifications and fish habitat assessments for select streams located within the Houston Forest... -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream... -
Skeena Bulkley RMP: Enhancing Environmental Values
The Skeena Bulkley RMP was originally developed in 1999 and has been refined and updated annually. This document is the third section of the overall Skeena Bulkley RMP, and... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Upper Buck C...
This inventory provides information regarding the characteristics, distributions, and relative abundance of fish species, as well as information on biophysical lake and stream... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Shovel/Maxan Sub-Un...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages within the Babine Lake watershed group. This is a... -
Pacific Salmon Commission Northern Boundary Technical Committee Report: Statu...
This document presents an assessment of the status of coho salmon (Onchorhynchus kisutch) in the Canadian northern boundary areas with emphasis on the Skeena River. The content... -
Interim Restoration Plans for Watershed Units within the Morice Forest District
The following report presents the Interim Restoration Plans (IRP) for targeted watershed units (WU) within the Morice Forest District. The layout of this Interim Restoration... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Expansion and Recalibration of a Benthic Invertebrate Index of Biological Int...
The purpose of this project is to further explore the use of a B-IBI's as an effectiveness monitoring and stream condition assessment tool for long-term trend monitoring of... -
Comments Re Fish Habitat At Four Enbridge Crossings in Maxan, Gosnell, and Cl...
This document looks at proposed Enbridge stream crossings and presents comments concerning critical habitats in these systems. Upper Maxan Creek, Gosnell Creek, and Clore River... -
Coho Salmon in the Upper Bulkley River Watershed
This report provides a summary of the existing information up to June 2001 to provide local communities with an updated understanding of the state of coho populations in their... -
Calibration of a Multimetric benthic Invertebrate Index of Biological Integri...
The Index of Biological Integrity (IBI) is arguably the 'most widely used and effective' multimetric index of stream condition. The purpose of this project was to calibrate the... -
Bulkley River Watershed Overwintering Study Reports
This dataset contains all of the overwintering studies in the Bulkley River watershed. This over-wintering monitoring was conducted to provide background data to assist Habitat... -
2008 Stream Assessment for Select Areas and Road Crossings within Nadina Fore...
This report summarizes the results of the stream assessments, which were completed between July 14 and October 22, 2008. All evaluated drainages are within the Babine Lake...