Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a... -
BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report of...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information...