-
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Life History, Stock Assessment, and Recommendation for a Sustainable Recreati...
Buckley Lake was sampled September 8-10, 2003 by Skeena Region Fisheries staff in an effort to address: 1) rainbow trout history characteristics; and 2) provide advice to Skeena... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Effects of Beaver on Juvenile Coho Salmon Habitat in Kispiox River Tributaries
The purpose of this study was to collect data to determine how beaver dams might affect coho populations in tributaries of the Kispiox River, and to provide a review of the... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application... -
A Reconnaissance Survey of McQuarrie Lake
This survey collected information about the fish species that are present in McQuarrie Lake, as well as information about the physical characteristics of the lake. This included... -
The Sockeye Salmon (Oncorhynchus nerka) of Morrison and Tahlo Lakes British C...
The purpose of this literature review is to provide a compilation of the published sockeye salmon fish literature on Morrison and Tahlo Lakes with references where appropriate... -
A Reconnaissance Survey of Seymour Lake 1983
This survey presents physical data of Seymour Lake. This includes terrain features, access, resorts and campsites, obstructions and pollutions, developments, aquatic plants,...