Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for... -
Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The... -
Water Temperature, River Discharge, and Adult Sockeye Salmon Migration Observ...
Water temperature, river discharge, and adult sockeye salmon migration observations in the Babine watershed, 1946-2014. Historical meteorological and hydrological data were... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and Sites...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Upper Bulkley Fish and Aquatic Review: Stream Flow, Surface Water Licenses an...
Upper Bulkley fish and aquatic review: stream flow, surface water licenses and groundwater wells. The Upper Bulkley Fish and Aquatic Review Project produced a set of analyses... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Streamflow Trends in the Skeena Region
This report is intended to improve the ability of the proponents of major projects (e.g., mines, run-of-river power projects) and the responsible regulatory agencies to address... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance Sedi...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1)... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section... -
Reinstallation of Historic Water Survey of Canada Staff Gauges, Upper Bulkley...
Nadina Community Futures (NCF) of Houston, BC, has implemented a program of water level monitoring in the Upper Bulkley River watershed to determine effects of resource... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Water Tool
The Northwest Water Tool was developed for the Ministry of Forests, Lands and Natural Resource Operations to provide guidance on water availability across northwest BC and to... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious...