Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II Biop...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Upper Bulkley River Survey 1956
In August, 1955, a survey party inspected the Bulkley river from the falls to Bulkley Lake and sections of Maxam Creek and its main tributary, Foxy creek. Information on water... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and Sites...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Skeena Steelhead Conservation Units
The purpose of this project is to provide an update of Skeena steelhead population structure that is more consistent with both the federal methodology and the intent of the wild... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice-Nanika Sockeye Recovery Plan
The Morice-Nanika Sockeye Recovery Plan process provides a framework for aboriginal, government, industry, and public groups to work together towards stock recovery. -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and...