-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Water Resources Service Pollution Control Branch - Lakelse Lake Water Quality...
A comprehensive water quality limnology study in Lakelse Lake was completed by the Pollution Control Branch in 1973 - 74. The expressed purpose of this study, as developed by... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning o...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Reconnaissance Survey of Twin Lake
Klohn-Crippen Consultants Ltd. was retained by the Fisheries Branch of the BC Ministry of Environment, Lands and Parks in Smithers (MELP), British Columbia, to conduct a... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream... -
Canada's Policy for Conservation of Wild Pacific Salmon
Links to sites related to the Fisheries and Oceans Canada Wild Pacific Salmon Policy -
Bioassessment of Streams in North-Central British Columbia Using the Referenc...
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application...