Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to...