Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Shovel/Maxan Sub-Un...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages within the Babine Lake watershed group. This is a... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of Pete...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Operational Stream Inventories for FL A-16823: A Compilation of Data from Ope...
The purpose of these projects was to compile and summarize all fisheries information collected in the Burns Lake area throughout the Babine Forest Products Company (BFP)... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Fish Habitat Inventory & Information Program: Stream Summary Catalogue
This catalogue contains a summary of information on fish and fish habitats for 83 streams in the DFO Subdistrict 4D, Smithers, Volume 2 (Bulkley). The catalogue is organized as... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application... -
A Reconnaissance Survey of McQuarrie Lake
This survey collected information about the fish species that are present in McQuarrie Lake, as well as information about the physical characteristics of the lake. This included...