Salmon Enhancement Scoping in Northern and Central B.C.
This dataset contains a report with a systematic identification and conceptual development of potential production-scale enhancement projects in Northern and Central BC. The... -
North Coast Restoration Project Effectiveness Monitoring
In April 2013, the Pacific Salmon Commission Northern Fund provided resources to DFO’s North Coast Resource Restoration Unit to study a suite of restoration projects undertaken... -
Pacific Salmon Strategy Initiative Reports
This reports summarize the projects implemented through the Salmon Habitat Restoration Center of Expertise (RCOE) Operational Fund. This internal fund, developed as a 3-year... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Interim Restoration Plans for the Nine Watersheds in the Central Kalum...
These plans were established as part of Forest Renewal BC requirements to focus restoration efforts on a smaller selection of targeted watershed units. The complete Interim... -
Fish and Fish Habitat Inventory for Operational Areas Fulton River Watershed...
The study area is located in Fulton River watershed of the Babine drainage in north-central British Columbia (Figure 1). Selected streams in the area were inventoried for Forest... -
Lakelse Lake Management Plan
The overall mission of this lake management planning process is to devise methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan... -
Fish Passage Planning: Falls River Watershed
The Falls River watershed was chosen for assessment planning due to a synergy between the objectives of the British Columbia Ministry of Environment and Climate Change Strategy... -
Zymoetz (Copper) River Watershed Restoration Program: 16-Km Side Channel (Site 54B)
This dataset focuses on the restoration works conducted at Site 54B, one of the many restoration works conducted along the the Zymoetz (Copper) Rivers in the late 1990s/early... -
Spawning Channel / Improved Spawning Habitat Project
This reports outlines the progress on four proposed projects in the Lakelse watershed in 2008/09 intended to improve spawning and incubation habitat for declining sockeye... -
Copper River Watershed Restoration Program: Site 9 Berm Removal & 3km Side Channel
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Routine Effectiveness Evaluation - Off-channel ponds and debris structure...
This datasets contains information about restoration and construction works conducted at three sites along the Copper (Zymoetz) River. For more information on the sites, visit... -
Interim Resource Plans for Copper Lower, Clore, Kitnayakwa
This dataset contains the interim resource plans for multiple sub-watersheds.