-
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Level I Detailed Field Assessment of Aquatic and Riparian Habitat for Coldwat...
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves a number of steps that commence with an overview study, followed by a detailed... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance Sedi...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1) sediment source mapping and reconnaissance sediment budgeting upslope of the alluvial... -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design Rep...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the Maxan watershed. -
Lakelse Sockeye Fry Outplant Program
This dataset refers to the Lakelse Sockeye Fry Outplant Program of 2006-2014 and contains data analysis for each year, discussing the change in salmon population, population health, and restoration attempts. -
Lakelse Lake Egg Capsule Incubation Study
A record for the proposal of the Lakelse Lake egg capsule incubation study. It is believed that poor stream habitats is the leading cause of the rapid decline to Lakelse Lake sockeye populations. With support from the Lakelse Lake Sockeye Recovery Team and... -
Kitwanga Sockeye Salmon Recovery Plan (KSRP)
The Kitwanga sockeye stock is currently at a depressed level and at risk of collapse. The collapse of Kitwanga sockeye could lead to extinction, which should be considered irreversible. The reasons for the stock decline are not completely understood,... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas (KLNG) facility to the Spectra Energy Transmission BC pipeline facilities located... -
Interim Restoration Plans for Watershed Units within the Morice Forest District
The following report presents the Interim Restoration Plans (IRP) for targeted watershed units (WU) within the Morice Forest District. The layout of this Interim Restoration Plan has been broken down by watershed unit. For each watershed unit, a brief... -
Habitat Restoration & Salmon Enhancement Program (HRSEP) 1998/99 Summary Report
The Habitat Restoration and Salmon Enhancement Program (HRSEP) was established in 1996/97 to complement the Pacific Salmon Revitalization Strategy. The main objective of the federally funded HRSEP is to revitalize salmonid populations in British Columbia... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
Assessment of Stream Protection Practices in the Interior of the Prince Ruper...
Assessment of stream protection practices in the interior of the Prince Rupert Forest Region. Stream protection measures used in forestry operations in the interior of the Prince Rupert Forest Region were reviewed through interviews and field inspections.... -
Trophic Status and Rearing Capacity of Smaller Sockeye Nursery Lakes in the S...
This report attempts to predict rearing capacity and optimum escapements for ten non-Babine study lakes around the Skeena River. Its main objectives are recognizing the status of juvenile stocks and trophic status of the ten lakes, along with potential... -
Scully Creek Egg Incubation Assessment 2008-2009
This project was part of a larger ongoing habitat project in the Lakelse Lake Watershed in efforts to reverse the declining trend of the sockeye salmon population. It focuses on monitoring the middle channel of Scully Creek in order to determine the... -
PSF Climate Adaptation Workshop: A First Nations Perspective on Climate Chan...
A link to a recording of the Pacific Salmon Foundation 2021 Climate Adaptation Workshop hosted by the Pacific Salmon Foundation. The goal of this workshop was to bring together salmon scientists and stewards to discuss issues, challenges and solutions... -
Morice-Nanika Sockeye Recovery: Evaluation of Enhancement Options
The purpose of this report is to present the known history of sockeye production data, the biological and management information available, enhancement requirements, and potential techniques for the restoration of Morice-Nanika sockeye. -
Environmental Mitigation Plan Strimbold Bridge Maxan Creek Deactivation
This environmental mitigation plan identifies the issues and mitigation measures to best accomplish the collapsed bridge removal with the least environmental impacts and the safest approach. This plan considers different site conditions that may exist at...