Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport ...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of Zymoetz-Clore steelhead. -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Value of the Fisheries Resources in the Bulkley River System
The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and future values of recreational, commercial and, to some degree, Indigenous fishing... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Ridley Island Port Construction Activities - 1982: Background and Environment...
This report contains the findings of an EPS program carried out in the summer of 1982 to monitor the effects on the receiving environment of port construction activities underway on National Harbours Board-owned Ridley Island and vicinity near Prince... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution in...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage and waste disposal, mining and smelter activities, various large industrial... -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and Prote...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed. The goals of the plan are to: • Maintain and protect existing fish habitat; •... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal objectives. There are four main sections to the plan: General Management... -
Mission Creek Adult Coho Enumeration and Transport Program: 1998 Program Report
A broomstick fence was constructed and installed in early September 1998. Coho capture and counting occurred from early September to November 1, 1998. The purpose of the counting fence system was to enumerate coho adults returning to Mission Creek and to... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Fish Population Monitoring in Foxy and Buck Creeks
Sampling at fish index sites was conducted at five locations in Foxy and Buck creeks for Equity Silver Mines Ltd. from September 1988 to 1991. -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
A Revised Predictive Model for Bioassessment of Streams in Northwest British ...
A revised predictive model for bioassessment of streams in northwest British Columbia using the reference condition approach: Skeena model. This document describes the Skeena Model, developed for stream bioassessment in northwest BC using the reference... -
Draft Environmental Effects Evaluation/Application for an Environmental Asses...
Vopac Pacific's overview of the environmental effects of the construction and opertation of the Vopac Pacific Canada Project, which will store Liquified Petroleum Gas, Clean Petroleum Products, and methanol.