Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Tenas Project Application Information Requirements 2022
The Application Information Requirements (AIR) specifies the information that Telkwa Coal Limited (the Proponent) is required to provide in their Application for an Environmental Assessment Certificate (Application) under section 16(2) of the British... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the Purpos...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-specific water quality guidelines (SSGs) for British Columbia and the Yukon.... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Equity Mine Water Quality Data
Equity mine water quality data from 2011 to 2016. Data includes pH, conductivity, anions and nutrients, metals, and total suspended solids. This is a subset of the BC Environmental Monitoring Stations (EMS). Visit... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Davidson Project Description
Blue Pearl Mining is proposing to develop the Davidson deposit as an underground mine and to transport the ore off-site for processing. The Davidson deposit is situated a distance of 2 km into the east side of Hudson Bay Mountain at an elevation of... -
Davidson Project Aquatics Baseline Report, 2006-2008
This report describes aquatics baseline studies conducted in the Davidson study area from 2006 (June) until 2008 (November). The objective of these studies was to characterize water quality, sediment quality, and benthic invertebrate communities. Aquatic... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective.