Telkwa Coal Project: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa River.... -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders, identifying the issues the project may cause and responding to comments and... -
Tenas Project Indigenous Consultation and Engagement Plan
The primary purpose of the Indigenous Consultation and Engagement Plan is to describe the approach, methods and activities TCL is proposing to implement to continue its efforts to build and establish a collaborative partnership with the Wet’suwet’en and to... -
Tenas Project Application Information Requirements 2022
The Application Information Requirements (AIR) specifies the information that Telkwa Coal Limited (the Proponent) is required to provide in their Application for an Environmental Assessment Certificate (Application) under section 16(2) of the British... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
MTA - Mineral, Placer and Coal Tenure Spatial View
Holds data for mineral, placer claims and leases, as well as, coal licence applications, licences and leases within the Province of British Columbia. This is the spatial view utilized by Mineral Titles Online on the mineral, placer and coal viewers,... -
Fish Population Monitoring in Foxy and Buck Creeks
Sampling at fish index sites was conducted at five locations in Foxy and Buck creeks for Equity Silver Mines Ltd. from September 1988 to 1991. -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Davidson Project Aquatics Baseline Report, 2006-2008
This report describes aquatics baseline studies conducted in the Davidson study area from 2006 (June) until 2008 (November). The objective of these studies was to characterize water quality, sediment quality, and benthic invertebrate communities. Aquatic... -
An Environmental Assessment of the Watershed Adjacent to Hallmark Resources, ...
The Environmental Protection Service is engaged in monitoring programs of the various industrial concerns that constitute potential hazards to the receiving water quality. The Water and Land Quality Group is specifically concerned with measuring deleterious... -
A Preliminary Evaluation of the Environmental Impact of Mining, Community Dev...
An ecological study to assess the impact of environmental changes on the Babine sockeye production is currently being conducted under the auspices of the Babine Watershed Change Program. Specifically the Environmental Quality Unit of the Northern Operations... -
Telkwa Coal Project Appendix 2: ARD Potential and Management 1994
This report follows previous studies in 1985 on the coal deposits near Goathorn Creek, and in 1990 and 1991 on the coal deposits north of the Telkwa River. This report discusses all relevant evidence on the potential for acid generation, provides a... -
Davidson Project: Update of MODFLOW Model
This document details an updated groundwater model for the Davidson EA. Key differences between this version of the model and the previous version are a change in the model domain to allow groundwater to flow to Glacier Gulch and Simpson Creek watersheds...