-
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts for further assessment and/or rehabilitation. A detailed review and... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The study area includes the lower portion of the Upper Bulkley watershed upstream of... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Results,...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including a review of fish, fish habitat, impacts, and water quality. Furthermore, the... -
Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy, and regulation, science and technology, as well as government and "stakeholder"... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Hydrologic Regimes in a Changing Climate: Characteristics and Response of Wet...
Hydrologic regimes in a changing climate: characteristics and responses of wetland and off-channel habitat along the Telkwa River and the implications for juvenile coho salmon. Given changing climatic conditions in British Columbia, Canada, there is a need... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the L...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for silvicultural planning on the lower Skeena River floodplain: biophysical... -
A Fisheries Inventory of some Streams Within the Morrison Lake - Hatchery Arm...
This study had the following objectives: provide a source upon which the habitat protection section of the fish and wildlife branch could base protection guidelines, provide Northwood with an assessment of fishery values and related habitat which would be... -
Telkwa Coal Project Aquatic Resource Assessment (1985)
This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and...