Review of Cattle-Community Watershed Conflicts in the Skeena Region
This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and... -
Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and quantity monitoring and reporting in British Columbia, providing examples of who is... -
Value of the Fisheries Resources in the Bulkley River System
The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and future values of recreational, commercial and, to some degree, Indigenous fishing... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to recommend provisional water quality objectives to protect those uses. -
Skeena-Nass Area Bulkley River Basin Water Quality Assessment and Objectives
This historical report includes: (i) an assessment of water quality using available information (up to April, 1984) on waste discharges, water quality, streamflows, and water uses; (ii) a prediction of future water quality, considering future waste... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three Desi...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the design of the Cycle Three program. Five elements of the EEM program will be... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Prince Rupert Landfill Leachate: Impact on Hays Creek
This report documents the leachate and creek water chemistry findings and remove all doubt that the creek is adversely affected. -
Prince Rupert Area Coastal Fish Habitat Bibliography
A bibliography of existing coastal information describing habitat and biota. -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A Su...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture and subsequent clean-up efforts to river processes, fish and fish habitat, and... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA).