Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product.... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Review of the Environmental and Socio-Economic Impacts of Marine Pollution in...
This report attempts to provide a preliminary review of the some of the possible impacts, monitoring, and mitigation measures for many of the pollution issues including sewage and waste disposal, mining and smelter activities, various large industrial... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Goldcorp Canada Ltd - Equity Division Environmental Report
This report has been prepared in support of the Ministry of Environment permit P.E.4475 and the Ministry of EMNG reclamation permit M-114. This report focuses on the environmental performance of Goldcorp Canada Ltd – Equity Division during 2012. -
Fish Population Monitoring in Foxy and Buck Creeks
Sampling at fish index sites was conducted at five locations in Foxy and Buck creeks for Equity Silver Mines Ltd. from September 1988 to 1991. -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Davidson Project: Ministry of Environment Environmental Management and Enviro...
Comments made by the Ministry of Environment with respect to the Blue Pearl Mining Davidson Project environmental management act authorization application. -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Consequences of Unregulated Release of Raw Acid Mine Drainage into the Bulkle...
Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley River if it was allowed to flow untreated from the property for a prolonged... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison... -
Environmental and Reclamation Measures Equity Silver Mines Ltd. - 1988
The purpose of this paper is to summarize rehabilitation measures, reclamation programmes, costs, equipment selection, and research carried out at Equity Silver Mines Limited. -
Environmental and Reclamation Measures Equity Silver Mines Ltd. - 1987
The purpose of this paper will be to offer a brief overview of these measures. Key topics for discussion will be: kinetics of Acid Mine Drainage, acid generating potential, water treatment and sludge handling, special wastes, waste dump construction, waste...