-
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Impacts of the Mountain Pine Beetle in the Babine River Ecosystem Network
The primary objective of this study is to determine if the Babine Watershed ecosystem network is effective in maintaining biodiversity in the face of climate-induced disturbance from mountain pine beetle.