Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Davidson Project: Predicted Groundwater and Surface Water Chemistry Before, D...
This report illustrates and discusses the temporal trends in groundwater and surface water chemistry before, during, and after mining. It is based on empirical and predicted geochemistry and on the latest groundwater modelling using the MODFLOW model.