-
Fisheries Problems Associated with the Development of Logging Plans within th...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox fish passage assessment is part of a larger regional effort to improve fish... -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Roa...
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational access. -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream crossings distinguished with fish presence along Highway #16 between Terrace and Prince... -
An Assessment of the Effects on the Morice and Bulkley River Systems of a Pul...
This report assesses the economic and biological consequences of further development at Houston, B.C. The first part of this paper identifies the geographic and biological aspects of the Bulkley River system and evaluates, in dollar terms, the commercial,... -
Telkwa Coal Project Aquatic Resource Assessment (1985)
This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and...