District of Port Edward Sewerage Study
The purpose of this study is to develop a conceptual design for transporting sewage from the District of Port Edward to Skeena Cellulose Mill for joint treatment and disposal. -
Current and Proposed Mining, Energy, and Forestry Development in Northwest Br...
Map showing salmon habitat overlain with current and proposed infrastructure development in northwest BC. Infrastructure includes roads, forestry cutblocks, mines, transmission lines, pipelines, transmission lines, major projects, agricultural land tenures,... -
Cow Bay, Prince Rupert Development & Enhancement Plan
Reports and correspondence related to development plans, enhancement plans, and habitat assessment of Lot 17 in Cow Bay, Prince Rupert. -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish passage at crossings in high priority watersheds with the goal of... -
Bulkley River Project: Fabrication and Delivery of Structural Steel for Adult...
This document contains diagrams for fish fence models, such as guide frames, walkway panels, fry screen structures, and more. -
Bulk Liquids Terminal South Kaien Island Prince Rupert, B.C.
This environmental report is part of a 4-volume series of reports which address the proposed bulk liquids terminal at South Kaien Island, Prince Rupert, B.C. -
British Columbia Environmental Assessment Act and Regulations
British Columbia’s Environmental Assessment Act requires that certain large-scale project proposals undergo an environmental assessment and obtain an environmental assessment certificate before they can proceed. The current legislation came into effect in... -
BC Transmission Lines
High voltage electrical transmission lines for distributing power throughout the province. Lines were derived from several data sources representing unique inventories: BC Hydro, Private, Independent Power Producers, and Terrain Resource Information... -
BC Dams
Province-wide SDE spatial view displaying dam locations. The public view displays a subset of the attribute data. -
B.C. Timber Pulp Mill, Porpoise Harbour An Assessment of Mill Impact on the R...
This report presents data collected from June 1979 to April 1982 relating to water quality, sediment, organic and trace metal content, and benthic invertebrates from the vicinity of the B.C. Timber pulp mill, Porpoise Harbour. -
Assessment Report Index System (ARIS) Database
The British Columbia Geological Survey (BCGS) manages and maintains a library of over 38,300 mineral Assessment Reports. These reports have been filed by the exploration and mining industry since 1947 and describe exploration work costing over 2.8 billion... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory... -
An Assessment of the Effects on the Morice and Bulkley River Systems of a Pul...
This report assesses the economic and biological consequences of further development at Houston, B.C. The first part of this paper identifies the geographic and biological aspects of the Bulkley River system and evaluates, in dollar terms, the commercial,... -
A Cursory Investigation of the Productivity of the Skeena River Estuary
An investigation of the productivity of the Skeena River estuary subsequent to receipt of a port development proposal near Prince Rupert. -
A Biophysical Inventory of and Habitat Assessment for the Intertidal and Subt...
Habitat assessment for the rebuilding of the deteriorating mooring wall in Prince Rupert. -
Telkwa Coal Project Aquatic Resource Assessment (1985)
This report is the result of studies undertaken in 1984 that evaluated aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and... -
Pleasant Valley Bridge Crossing Fish Habitat Assessment Final Report
This final report contains the fish and fish habitat assessment around the area of the Pleasant Valley bridge in the Bulkley river, as well as a review of the bridge design plans. -
Morrison Mine Re-Consideration and Comments of Pacific Booker Minerals on the...
Comments from the Gitanyow Hereditary Chiefs on the Morrison copper/gold mine proposal. -
Floodplain Stability, Morice River, Between Owen Creek and Thautil River
A geomorphological study of the Morice River floodplain, between the confluence of the Thautil River and Fenton Creek (Reach 2), was undertaken at the request of the Forest Service, Morice Forest District to identify the extent of the floodplain and prepare...