-
Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest stewardship objectives. The field procedure for Water Quality Effectiveness Evaluation... -
Lakelse Lake Limnology and Juvenile Fish Ecology: 2003 Update
In 2003, Fisheries and Oceans Canada personnel carried out a study of the limnology and fish ecology of Lakelse Lake. A similar study was also carried out in 1994. The focus of the study was on juvenile sockeye rearing habitat, which is the offshore portion... -
Ecological Interactions in the Flooded Littoral Zone of Reservoirs
Ecological interactions in the flooded littoral zone of reservoirs: The importance and role of submerged terrestrial vegetation with special reference to fish, fish habitat and fisheries in the Nechako Reservoir of British Columbia, Canada. This report... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II Biop...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a biophysical and sociopolitical profile of each of the priority watershed planning... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring rehabilitation of logging-impacted hill slopes, riparian areas, and streams. -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Skeena River Estuary Synthesis Report
The research outlined in this report answers questions relating to the estuarine environment and ecology of the Skeena River estuary, with a focus on juvenile salmon. Additionally, it includes information on the estuarine fish community, crab ecology, and... -
Secondary Lake Inventory of Unnamed Lake - Watershed Code: 480-502100
A secondary lake inventory (RIC 1999, 2000) was conducted on an Unnamed Lake located approximately 13 km west of the outlet of Morrison Lake and 13.3 km north of Smithers Landing on Babine Lake, B.C.. The main objectives of the secondary lake inventory... -
Review of Resident Game Fish Life History and Abundance Information for Babin...
Babine Lake is the largest unimpounded lake entirely within the province of British Columbia, and likely receives more annual angler days than any other lake in Skeena Region. It is also the most important sockeye salmon nursery lake in the Skeena... -
Resource Development in the Upper Zymoetz River Catchment 1995
This report addresses issues concerning the Class I angling water designation of the Zymoetz River. Attributes associated with the Zymoetz River's Class I angling water designation, conflicting resource values, and outstanding interagency issues are... -
Reconnaissance Survey of Lakelse Lake
This survey collected information about the fish species that are present in Lakelse Lake, as well as information about the physical characteristics of the lake. This includes aquatic vegetation, terrain features, food species, natural spawning and... -
Reconnaissance Survey Seymour Lake Data Cards
These data cards describe the quality of Seymour lake, including the species and vegetation present and the current and potential recreational use. A chemical analysis for T.D.S., pH, and oxygen are also included. -
Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper Ki...
A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to locate and describe the preferred rearing habitat of juvenile salmonids in the Kalum... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Northwest Coast Traditional Salmon Fisheries System of Resource Utilization
This thesis presents evidence that traditional systems of salmon production were generally coincident with seasonal migrations of adult salmon returning from marine environments to fresh water spawning grounds. This characteristic movement of salmon biomass... -
Nadina Mountain Park Management Plan
The Nadina Mountain Park management plan establishes long-term strategic direction for Nadina Mountain Park. It sets out a vision for the future state of the park; addresses current issues affecting that long term vision; and, guides day-to-day park...