11 datasets found

Tags: water quality metals waste discharge discharge

Filter Results
  • Review of Cattle-Community Watershed Conflicts in the Skeena Region

    This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including...
  • The Flooded Tailings Impoundment at the Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This...
  • Review and Assessment of Water Quality in the Skeena River Watershed, British...

    Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,...
  • Nutrients and Algae in the Upper Bulkley River watershed 1997-2000

    This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing...
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...

    This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and...
  • BC Surface Water Monitoring Sites

    The Surface Water Monitoring Sites web application allows users to browse a map interface to find freshwater monitoring locations throughout BC. Clicking on a station provides the name and description of the water quality monitoring station as well as...
  • BC Environmental Monitoring System Results

    The Environmental Monitoring System (EMS) test results as .csv files available for download. Results include physical, chemical and biological analyses of samples taken from water, air, solid waste discharges and ambient monitoring sites throughout the...
  • BC Environmental Monitoring System (EMS)

    The Environmental Monitoring System (EMS), is the Ministry of Environment corporate electronic repository for the capture and extraction of results for chemical, physical and biological analysis performed on air, water, biological, solid waste discharge,...
  • 2012 Sustainability Report Closed Sites in Honduras, Mexico, the United State...

    The focus of this report is on Goldcorp’s one closed site in Honduras (San Martin), one closed site in Mexico (Nukay in Guerrero), four closed sites in the United States (Dee and Daisy in Nevada, Rand in California, and Golden Reward in South Dakota) and...
You can also access this registry using the API (see API Docs).