-
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of ...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including salmon populations. It is apparent that collaborative efforts to better manage and... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Threshol...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
TANTALIS - Crown Land Rights-of-way
This dataset contains the spatial representation (polygon) of active and applied for Statutory Rights-of-way. Statutory rights-of-way are registerable in a Land Titles office, and are normally issued to authorize linear uses of Crown Land for... -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National Harbours Board. -
Skeena Estuary and Industrial Development
A review of the Skeena estuary and the proposed industrial developments in the area. -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of Ridley Island. This paper describes the results of the grain analysis and... -
Riparian and In-Stream Assessment of the Bulkley River System: An Examination...
Sixty-eight tributaries to the Bulkley River were examined by topographic maps and air photo interpretation to assess the degree and nature of the impacts on these streams by transportation and hydro-electric powerline corridors and... -
Resource Development Patterns of the British Columbia Salmon Canning Industry...
This thesis analyzed the long term history of the salmon canning industry along the B.C. coast between 1870 and 1970 to understand the spatial pattern of the processing plants and some of the factors that controlled the pattern. -
Rail Evacuation Maps
Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare these risks with similar existing gateways in North America, and to identify... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Follow-up Audit on the Transportation of Dangerous Goods
This audit focused on the extent to which Transport Canada and the Canada Energy Regulator implemented recommendations from our 2011 and 2015 reports regarding these organizations’ compliance and enforcement responsibilities for the safe transportation of... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and intermodal facilities at the existing Fairview Terminal and the construction and... -
Davidson Project: Ministry of Environment Environmental Management and Enviro...
Comments made by the Ministry of Environment with respect to the Blue Pearl Mining Davidson Project environmental management act authorization application. -
Draft Environmental Effects Evaluation/Application for an Environmental Asses...
Vopac Pacific's overview of the environmental effects of the construction and opertation of the Vopac Pacific Canada Project, which will store Liquified Petroleum Gas, Clean Petroleum Products, and methanol. -
Conceptual Marine Fish Habitat Offsetting Plan: Westcoast Connector Gas Trans...
This marine CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP) for the Westcoast Connector Gas Transmission Project. A freshwater CFHOP companion document has also been prepared. The FHOP will be...