Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox fish passage assessment is part of a larger regional effort to improve fish... -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries: T...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek watershed. Designated water uses, to be protected by water quality objectives, are... -
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of ...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including salmon populations. It is apparent that collaborative efforts to better manage and... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and Sites...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document human-induced modifications to floodplain habitat and river channelization,... -
Skeena Delta Sedimentation, British Columbia
Sediment samples were collected from the sea floor off the delta front, from the lower reaches of the Skeena River channels, and from small beaches and basins in the vicinity of Ridley Island. This paper describes the results of the grain analysis and... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish...