17 datasets found

Tags: surface water water quality Licenses: Other (Not Open) Categories and Collections: habitat

Filter Results
  • Review of Cattle-Community Watershed Conflicts in the Skeena Region

    This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including...
  • Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...

    Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion...
  • Water Quality in British Columbia Objectives Attainment

    The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the...
  • Water Monitoring in British Columbia: Scanning the Data Landscape Public Report

    The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and quantity monitoring and reporting in British Columbia, providing examples of who is...
  • Vopak Pacific Canada Project Description

    The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where...
  • Upper Bulkley River and Toboggan Creek Overwintering Studies

    An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The study area includes the lower portion of the Upper Bulkley watershed upstream of...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Seymour Lake: 1984 Data Summary and Recommendation

    The 1984 sampling program for Seymour Lake was designed to provide nutrient loading data for the lake such that a management prescription for the lake and watershed management guidelines could be proposed. Water quality sampling of the lake showed that...
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Northwest Transmission Line Project: Assessment Report

    This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out EAO's analysis and...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Morice Water Management Area - Multi-Year Operational Plan

    This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA).
  • Kitimat - Summit Lake Pipeline Looping Project: Assessment Report

    The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the...
  • A Creel Survey of Helene Lake July, 1982

    This report summarizes the results of this creel census and provides details of age and growth of rainbow trout stocked in a barren lake.
You can also access this registry using the API (see API Docs).