Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Ass...
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from forest development and harvesting activities. Recommendations for further... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Assessment of Stream Protection Practices in the Interior of the Prince Ruper...
Assessment of stream protection practices in the interior of the Prince Rupert Forest Region. Stream protection measures used in forestry operations in the interior of the Prince Rupert Forest Region were reviewed through interviews and field inspections.... -
Telkwa Coal Project Appendix 2: ARD Potential and Management 1994
This report follows previous studies in 1985 on the coal deposits near Goathorn Creek, and in 1990 and 1991 on the coal deposits north of the Telkwa River. This report discusses all relevant evidence on the potential for acid generation, provides a... -
Excel Energy Inc: Birch Oil Sales Pipeline Pre-Impact Fisheries Habitat Asses...
Excel Energy Inc. planned to construct an oil pipeline in the area of the Birch oil field in northeastern British Columbia. The project involved the construction of approximately 36 kilometres of pipeline for the purpose of transporting crude oil from...