-
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts for further assessment and/or rehabilitation. A detailed review and... -
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed Usi...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon, Ironside, and Lower Kispiox Watersheds that are producing road related sediment that... -
Fish Passage Culvert Investigations Babine TSA
This project involved the assessment of all designated fish-streams crossings in the priority watersheds within the study area to determine which stream crossing structures were barriers and preventing fish passage. Recommendations were made for each stream... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory... -
Climate Change Adaptation Planning for Northwest Skeena Communities
A report for Skeena communities on opportunities, tools, and challenges on adaptive and integrated management of forests, fish, and local values in a changing climate. The report presents the results of sociological research and workshops held from...