-
A Creel Survey of the Lakelse River Cutthroat Trout Sports Fishery
Lakelse River supports an important cutthroat trout fishery that peaks during the months of April and May. Local sportsmen have recently voiced concern that the cutthroat population is declining, witnessed by a decrease in the size of the fish taken as well... -
Suskwa River Steelhead: Colonization of the Upper Harold Price with Steelhead...
Since 1978, the Fish and Wildlife Branch has been conducting a steelhead enhancement project to colonize Harold Price Creek above the Harold Price Falls with steelhead fry. This project was designed to increase the number of adult steelhead returning to the... -
Steelhead Fish Observation Data
Fish Observation Data from GeoBC (October 2016) that is clipped to the Skeena Watershed. -
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was made to regional files, Department of Fisheries publications, Fisheries Research... -
Provincial Framework for Steelhead Management in British Columbia
This framework document is intended to meet the need of regional flexibility necessary to respond to the diversity of conditions, challenges and angler preferences found across the province in relation to Steelhead management. This management framework aims... -
Options for the Babine River Area
Land management strategies and access route options for the Babine River planning area. -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River...
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and Parks (MOELP) and the Department of Fisheries and Oceans (DFO) staff as sensitive to... -
British Columbia Fish Passage Program
The project objectives for Maxan creek were to remove the Strimbold Bridge that is impacting fish habitat and likely a barrier to fish passage at some flows, and may pose an environmental risk if washed downstream due to flood event. -
Adult Steelhead Studies in the Upper Sustut River 1992
Steelhead studies were conducted in the upper Sustut River during the late summer and fall 1992. The objectives of the studies were to determine the time of arrival, abundance, and migration behaviour of steelhead and to assess the upper Sustut River's... -
A Survey of Morice River Steelhead Anglers in 2004
Morice River steelhead anglers were surveyed during the 2004 Classified Waters Period using a combination of interviews and aerial counts. During the early Classified Waters Period, fishing was restricted to fly fishing only above Lamprey Creek, and the... -
A Survey of Kispiox River Steelhead Anglers in 2001
The Kispiox River in the Skeena Region of northwestern British Columbia (B.C.) is well known for providing a high quality steelhead (Oncorhynchus mykiss) recreational fishery. In 1990, the province of B.C. implemented a Classified Waters system to protect... -
A Brief Overview of Fish, Fisheries and Aquatic Habitat Resources in the Mori...
The objective of this report is to present a concise distillation and elaboration where necessary, of the existing knowledge, studies and reports related to fish, fish habitat, other aquatic resources, riparian management, and generally factors related to... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life Histo...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew switched to a casual creel survey and an adult steelhead tagging program during... -
Environmental Mitigation Plan Strimbold Bridge Maxan Creek Deactivation
This environmental mitigation plan identifies the issues and mitigation measures to best accomplish the collapsed bridge removal with the least environmental impacts and the safest approach. This plan considers different site conditions that may exist at...