-
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data included fish species present, invertebrates, in-stream and bank vegetation,... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compe...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas (KLNG) facility to the Spectra Energy Transmission BC pipeline facilities located... -
Biophysical Reconnaissance of the Morice River System, 1978-1980
A bio-manageability study of chinook and coho salmon was carried out on the Morice River near Houston, B.C. from the fall of 1978 to mid-1980. The objective of the program was to code wire tag at least 50,000 chinook fry from the 1978 and 1979 broods and as...