43 datasets found

Tags: spawning Categories and Collections: water habitat

Filter Results
  • Assessment of the Impact of the Kemano II Proposal on the Fish and Wildlife R...

    In 1974 and 1975, the Fish and Wildlife Branch conducted field studies on the fish and wildlife populations in the Nanika-Kidprice system which would be affected by the proposed Kemano II project. The field portion of these studies was funded by B.C. Hydro....
  • Fish Passage Assessment of Kispiox Forestry Road Stream Crossing

    The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox fish passage assessment is part of a larger regional effort to improve fish...
  • DFO Area 4 Annual Reports 1950 - 1972

    DFO Area 4 Annual Narrative Reports from 1950 to 1972. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution (chemical spills),...
  • DFO Area 4 Annual Reports 1918 - 1949

    Department of Fisheries and Oceans Area 4 Annual Reports from 1918 - 1949. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution...
  • DFO Area 4 Reports 1973 - 1984

    DFO Area 4 Annual Narrative Reports from 1973 to 1984. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution (chemical spills),...
  • Conserving Morice Watershed Fish Populations and their Habitat: Stage II Biop...

    This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a biophysical and sociopolitical profile of each of the priority watershed planning...
  • Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2

    Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of...
  • Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999

    In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and parr abundance. This report summarizes the results of those surveys and provides a...
  • Upper Bulkley River Survey 1956

    In August, 1955, a survey party inspected the Bulkley river from the falls to Bulkley Lake and sections of Maxam Creek and its main tributary, Foxy creek. Information on water velocities, temperatures, and amount of suitable spawning gravel available and...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document

    This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of...
  • Results of the Kloiya River Resistivity Counter

    The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began investigating the potential of using the Kloiya as an index stream for monitoring...
  • Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...

    Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and habitat characteristics, and to provide stream classifications according to the...
  • Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...

    This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for use in interpretation of habitat sensitivity and capability for fish production.
  • Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Shovel/Maxan Sub-Un...

    The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages within the Babine Lake watershed group. This is a continuation of a multi-year FRBC project commenced in 1996 for the Babine Forest...
  • Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...

    This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First...
  • Morrison Copper/Gold Project Fish Habitat Compensation Plan

    Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,...
  • Morrison Copper/Gold Project Assessment Report

    This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Morice-Nanika Sockeye Recovery Plan

    The Morice-Nanika Sockeye Recovery Plan process provides a framework for aboriginal, government, industry, and public groups to work together towards stock recovery.
You can also access this registry using the API (see API Docs).