-
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of values at a broad spatial scale. The goal of the pilot was to improve the consistency... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Babine River Interim Local Resource Use Plan
This plan describes the management consensus option and resource management issues for the Babine River area. It includes the watershed management prescriptions developed to meet the objectives of the consensus option.