-
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Resource Development in the Upper Zymoetz River Catchment 1995
This report addresses issues concerning the Class I angling water designation of the Zymoetz River. Attributes associated with the Zymoetz River's Class I angling water designation, conflicting resource values, and outstanding interagency issues are... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental Assessment Act. This environmental assessment will consider the potential effects of... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the...