Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Lakelse
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by Skeena sockeye for migration, spawning, and rearing, as well as their relative... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en response in respect of the proposed Coastal GasLink pipeline project within... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency - Pac...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific NorthWest LNG project near LeLu Island. -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A Su...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture and subsequent clean-up efforts to river processes, fish and fish habitat, and... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the construction of a Tailings Storage Facility, including tailings and seepage control dams,... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Application for Enbridge Northern Gateway Project Certificate of Public Conve...
This report summarizes the salmon-bearing regions that would be intersected by the Enbridge Northern Gateway Project. It analyzes the potential effects of pipeline spills and development to spawning and rearing grounds and to migration. -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project... -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison...