-
Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest stewardship objectives. The field procedure for Water Quality Effectiveness Evaluation... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning o...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their relative value in the nutrient cycle of Lakelse Lake. -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project.... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Babine River Interim Local Resource Use Plan
This plan describes the management consensus option and resource management issues for the Babine River area. It includes the watershed management prescriptions developed to meet the objectives of the consensus option. -
1982 Investigations of Adult Coho Salmon in the Telkwa River
A study to provide more detailed information on the timing and distribution of adult coho salmon spawning in the Telkwa River Basin was conducted between September and December 1982. Five tributary streams and the mainstem Telkwa River were examined for the... -
Lakelse Lake: A Collation of Research Studies and Government Documents
This reference guide has been put together for the Lakelse Watershed Stewards Society and while some aspects will seem quite familiar, other portions may be new material and have relevance to some of the concerns raised by the Lakelse Watershed Stewards...