-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and... -
Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product.... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three... -
Pacific Northwest LNG: Project Description
Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward, British Columbia (BC). This report outlines the procedures and plans for the... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Inventory of Streamflow in the Skeena Region
This report covers the Skeena region as defined by the Natural Resource Operations regions, and presents summary data and datasheets that have been revised and updated from those of the BCSI report (Obedkoff, 2001). The revision includes updated data beyond... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Coalbed Methane & Salmon: Assessing the Risks
This study aims to provide a preliminary assessment of the potential risks and pathways of impacts on salmon and salmon habitat arising from coalbed methane (CBM) development in the Klappan Coalbed Gas Tenure in northwest British Columbia, held by Shell... -
A Hydrologic Assessment of the Impact of the Swiss Fire on Buck Creek, Housto...
This report reviews the extent and severity of the Swiss Fire burn in the Buck Creek watershed. From this review, an assessment is made of the potential for increases in peak streamflows, sediment production, and summer low streamflows. -
Telkwa Watershed: A Forest Hydrology Analysis
This study reviews physical watershed characteristics, historical stream flow, and climatic data relevant to the Telkwa watershed. A simple modelling exercise is done to show the possible worst case effects of various degrees of forest harvesting on the...