Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and... -
Value of the Fisheries Resources in the Bulkley River System
The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and future values of recreational, commercial and, to some degree, Indigenous fishing... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Kathlyn, Seymour, Round, and Tyhee Lakes: Water Quality Assessment and Object...
This study quantifies the inputs of phosphorus from various sources and determines the extent to which additional phosphorus could be tolerated by each lake without a serious decrease in water quality. Based on this information, appropriate land uses and... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project...