-
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream crossings distinguished with fish presence along Highway #16 between Terrace and Prince... -
Report on the Preliminary Survey of Steelhead of Skeena River Drainage Systems
This report represents an effort to compile as much information as possible on the distribution, migration, and life history of steelhead in the Skeena system. Reference was made to regional files, Department of Fisheries publications, Fisheries Research... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the...