-
2008 Assessment of Forestry Road Crossings in the Kispiox River Watershed Usi...
The purpose of the 2008 Kispiox River Watershed, Forestry Road Crossing Assessment Project was to protect fish habitat by identifying stream crossings within the Cullon, Ironside, and Lower Kispiox Watersheds that are producing road related sediment that... -
Fisheries Problems Associated with the Development of Logging Plans within th...
This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox fish passage assessment is part of a larger regional effort to improve fish... -
Aquatic Resource Baseline Studies Telkwa Coal Project 1997 - Draft 2
Aquatic studies were conducted in the vicinity of the Telkwa Coal Project during 1997. These studies included updating baseline information describing the periphyton and benthic communities in Goathorn and Tenas creeks (Section 1), as well as studies of... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area consisted of five creeks of interest - Richfield Creek, Johnny David Creek, Byman Creek,... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Summary Report for Toboggan Creek Stream Rehabilitation and Silvern Lakes Roa...
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational access. -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors associated with human activities on three key species: eulachon, Chinook salmon and... -
Operational Guide for Forest Road Wetland Crossings
The purpose of this guide is to provide forestry professionals and contractors with a general understanding of boreal wetlands, what to expect in terms of water movement between different types of wetlands and general considerations when planning,... -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed an inspection of portions of the Northwest Transmission Line Project against... -
Mid-Bulkley Watershed Restoration Project: Level 1 Assessment Roads, Hillslop...
This report is the initial survey of the impacted areas within the Mid-Bulkley Watershed and denotes the nature of the impact from past timber harvesting and road building practices. -
Follow-up Audit on the Transportation of Dangerous Goods
This audit focused on the extent to which Transport Canada and the Canada Energy Regulator implemented recommendations from our 2011 and 2015 reports regarding these organizations’ compliance and enforcement responsibilities for the safe transportation of... -
Current and Proposed Mining, Energy, and Forestry Development in Northwest Br...
Map showing salmon habitat overlain with current and proposed infrastructure development in northwest BC. Infrastructure includes roads, forestry cutblocks, mines, transmission lines, pipelines, transmission lines, major projects, agricultural land tenures,... -
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish passage at crossings in high priority watersheds with the goal of... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory...