3 datasets found

Tags: risk assessment 2010s fish habitat assessment Categories and Collections: vegetation/ecology

Filter Results
  • Environmental and Socio-Economic Effects Report

    This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or socio-economic study topic.
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan E...

    The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the harmful alteration, disruption, or destruction (HADD) resulting from the Project....
You can also access this registry using the API (see API Docs).